At 15:30 PM on September 25th, a fire drill was conducted in the park. The drill was jointly organized by Liaoning xinyiyuanjin New Material Co., Ltd, Pan Jin Jia He Sheng Shi Pharmaceutical Technology Co., Ltd., Pan Jin Panjinhuafeng, and Panjinoubaikesi. Five companies jointly organized.
Each enterprise has set up a joint fire emergency and rescue leading group, which is based on the emergency and rescue leading group. If there is an initial fire accident, it should immediately inform the duty leader of the workshop. The duty leader should immediately organize the company's emergency rescue team to rush to the scene of the accident. After making a decision on the situation at the scene of the accident, the "119" public security fire command center was alerted and informed of the surrounding units. The initial fire accident was jointly rescued, the injured were initially rescued, and the "120" was called for help. And assist the medical personnel to send the wounded to the hospital for treatment, set up a security and alert area, and prevent unrelated personnel from entering the factory.
The general commanders of the fire drill were Minxigang, Zhaoqi, Rong Tiefeng, Liuxusheng, Fangrongliang, and Duhengbing. The main organizational departments were the headquarters, the fire fighting operation group, the evacuation guidance group, the safety protection rescue team, and the communication. Liaison and facilities protection group, environmental protection group six departments.
Under a "fire" password, the communications contact group immediately reported to the headquarters. The headquarters made a decision based on the situation on the scene and the fire fighting department quickly rushed to the fire scene to extinguish the source of fire; Then the evacuation guide group led the evacuation of employees as soon as possible to check whether there were any personnel stranded in each area; After receiving the fire information, the safety protection ambulance team performed initial first aid to the wounded at the fastest speed, and called the "120" emergency phone for help as appropriate, and set up a security alert area to prevent unrelated personnel from entering the area; The communications and facilities support group cuts off the power supply of the equipment in a timely manner to provide protection for fire prevention and evacuation; Finally, the Environmental Protection team is responsible for making sandbags into cofferdams on the site and monitoring the surrounding air indicators. If there is a phenomenon that exceeds the standard, further treatment will be carried out according to the environmental monitoring situation.
After the emergency training techniques are adopted, the emergency command center shall, in accordance with the relevant regulations, report the occurrence, development and emergency rescue of the accident to the competent department at a higher level, do a good job of protecting the scene of the accident and collecting the original data, and hand over relevant data to the accident investigation team. After the accident investigation team agrees, it can begin the rehabilitation and reconstruction work on the ground.
The exercise was carried out very smoothly, through the actual operation, let the employees of the company further understand the importance of fire safety. Safety production, prevention is the main, the practice of fire drill we do not panic, the departments are extremely cooperative with their respective functions, the problem will be successfully and efficiently resolved.